Summary0001437: Budget enabling
DescriptionCurrently, display of budgets in projects is set via the System Admin.
Not all projects will want this and I suggest that the enabling tick box and currency selection is moved to the Project setup page. Advantage is not losing the valuable screen real estate at the top of the page.
Even with this enabled, it could be given a expand/ contract control like that used in the Project Designer.

The currency selection could be a drop down of the standard codes (USD, GBP, EUR etc) as per ISO 4217. Displayed currency symbol is derived from this.

Similarly, budgets would only show in Tasks if enabled for the Project and suggest auto hide by default.
TagsNo tags attached.
Attached Files

-Relationships
+Relationships

-Notes

~0003171

caseydk (administrator)

Mostly agreed.. though I suspect Budgeting will become its own module before all is said and done. I don't think it's core enough to be included in the main system/admin.

My 0.02.. and I'm willing to be wrong. :)
+Notes

-Issue History
Date Modified Username Field Change
2014-01-03 19:34 sasquatch58 New Issue
2014-01-03 22:19 caseydk Project v3.1 Release => Pending Requests
2014-01-04 10:34 caseydk Note Added: 0003171
2014-04-05 17:28 caseydk Category General => System Admin
+Issue History